A lot of the extension calls I get in Naperville start the same way. The deck that came with the house is in decent shape, but it is small: a platform off the kitchen slider that was sized for two chairs and a grill. The family outgrew it. Now the homeowner wants another ten or twelve feet of deck, wants composite this time, and wants to know if we can build onto what is already there.
Sometimes we can. There are three ways an extension can go. The new frame can tie into the old one, so the boards run straight across and the whole thing reads as one deck. The new section can stand next to the old deck on its own ledger, beam, and footings, often a step lower, without leaning on it. Or the old deck comes out and we build the whole thing new at the bigger size.
Most people hope for the first option. Whether extending an existing deck works out that way depends on four parts of its frame, and you can check most of them yourself before anyone comes out.
What we check before tying into an old deck frame
The ledger
The ledger is the board bolted to your house that the joists hang from, and it carries close to half the weight of the deck. Run the extension along the house and the ledger gets longer. Push it out into the yard and the existing ledger ends up carrying a deck that is now partly new.
On a lot of Naperville decks built before the mid 2000s, the ledger was bolted through the siding into the rim joist with no flashing behind it. Water gets in behind that board and works into the framing of the house, which is the problem we covered in how an old deck can rot your house. Tying new framing to an unflashed ledger means building onto that problem. The old ledger has to come off and the wall has to be flashed properly, and once that is happening you are most of the way to a rebuild.
The wall where the new part of the ledger would go matters too. Brick and stone veneer cannot carry a ledger at all, and neither can a cantilevered floor or a bay window bump out. If your extension runs past the kitchen wall into a brick section or under a bay window, the new section needs its own beam and footings near the house. Our post on how your siding decides the way a deck attaches goes through each wall type we see around town.
Joist spacing and direction
Composite boards laid perpendicular to the joists need joists no more than 16 inches on center. Lay them diagonally and the limit drops to 12. Most decks that came with Naperville houses built from the late nineties through the 2000s were framed at 24 inches on center, which was correct for wood decking and is too wide for composite.
That matters for an extension because very few people want new composite on the extension and old wood boards on the original. Once the old section gets resurfaced to match, its frame has to meet composite spacing as well. At 24 inches, that means adding a joist in every bay with its own hangers and blocking, the reframe we walk through in our post on composite joist spacing on older Naperville frames. It is real work, so it should be in the extension quote from the first visit.
Joist direction changes the plan as well. If the extension continues the same way the existing joists run, the new joists can line up with the old ones and the boards can run straight through. If the extension wraps around a corner, the joists change direction where the two sections meet, and that seam needs a beam or doubled framing underneath and usually a breaker board on top.
The outer beam and the footings under it
Push the deck farther into the yard and the new joists have to land somewhere, usually on the old outer beam or on a new beam past it. In both cases the old beam and its posts end up carrying more deck than they were sized for, and the footings under them are asked to hold more.
Naperville wants deck footings at least 42 inches below grade so frost cannot heave them. A deck that has been in the yard for twenty years may or may not have been built to that standard, and the only way to know is to dig next to one and look. A shallow or undersized footing will move differently in a freeze than the new footings next to it, and you will see that movement at the seam. Soil varies across town as well. We wrote about why a footing near the DuPage River is a different job than one off Ogden Avenue.
Height, level, and the seam between old and new
Even careful framers get caught at the seam. An old deck has had years to settle. Joists sag a little, posts sink a little, and a surface that was flat when it was built now has a slight dip toward the middle. New framing goes in straight and level, so if the two sections are set to the same height on day one, any difference shows up right where they meet. Composite makes this worse because it shows every high and low spot in the frame underneath, where wood decking used to hide them.
The lumber adds its own movement. New pressure treated joists usually arrive wet from the treatment plant and shrink a little in depth as they dry out over their first season, while the old joists finished shrinking years ago. A seam that is flush in June can be visibly off by the next spring.
We handle that in one of three ways, depending on the deck. We plane and shim the old frame back to true, use kiln dried after treatment lumber for the new section when the seam has to stay flush, or design the seam so a small difference does not matter. A breaker board across the joint does that, and so does a single step down to a new level.
Can new composite match your existing deck boards?
If your current deck is wood, no. Composite next to pressure treated pine or cedar always looks like two decks, which is why an extension quote from us usually includes resurfacing the original section in the same boards. Our deck resurfacing page explains what that involves when the frame underneath is sound.
If your current deck is already composite, the answer depends on its age. Early uncapped composite boards faded and weathered a lot, and a new board will not match one that has been through ten Illinois summers. Capped boards hold their color much better. When we went back to inspect decks we had built around Naperville five years earlier, most of the capped composite decks were still within a shade of the original sample (the full results are in our five year review of cedar, Trex, and TimberTech). Even so, manufacturers retire colors and change board profiles every few years, so the exact board on your deck may not be sold anymore.
When a match is not possible, we make the difference look planned. That can mean a contrasting border board at the seam, a different color for a new lower level, or resurfacing everything so the old and new sections start weathering on the same day.
Permits, setbacks, and HOA review for a deck extension in Naperville
A deck extension in Naperville needs a building permit. The City of Naperville requires a permit for any elevated deck and for replacing structural or safety parts of an existing deck, including beams, joists, stairs, and railings. Most extensions involve both, since the new framing has to meet the old beam, ledger, or railing somewhere.
Where the new section bears on the old one, the drawings have to show the existing framing it depends on, because the plan reviewer is checking the load path all the way down to the footings. Expect the drawings to show footing depth and size, how the new section attaches to the house, and the lateral load connection to the house. Permit fees on a typical residential deck in Naperville run $400 to $600, and review usually takes two to four weeks. The full breakdown is in our post on the Naperville deck permit process.
Zoning is where extensions get into trouble more often than new decks, because the bigger footprint pushes toward the property line. Naperville’s code lets a deck project up to 10 feet into the required rear yard. In R2 zoning, where the rear setback is 25 feet, the deck has to stop at least 15 feet from the rear lot line. Other zoning districts use different setbacks, and corner lots have their own rules, which we cover in our guide to corner lot setbacks and variances.
Easements are the other limit. Utility and drainage easements often run along the back of a lot, and no part of a deck can sit on one. Pull a current plat of survey before you settle on a size, and measure from the lot line on the survey, not from your fence. The two can be several feet apart.
If your subdivision has an architectural review board, a bigger footprint goes through the HOA before the city will issue the permit. In Naperville that comes up most in Tall Grass, White Eagle, Ashbury, and Stillwater. What those boards usually ask for is in our Naperville HOA deck rules guide.
What a deck extension costs compared with building new
People expect an extension to cost less per square foot than a new deck, and it usually costs more. A new composite deck in Naperville runs about $60 to $95 per square foot installed, and the size by size ranges are on our Naperville deck builder page. An extension carries the same permit, drawings, inspections, and crew setup as a new deck, spread over fewer square feet. On top of that comes the tie-in work at the seam and, most of the time, resurfacing or reframing the old section so the two match.
So the line between extending and rebuilding moves with size. A modest extension on a sound frame is worth doing. When the extension is nearly as big as the original deck, or the old frame needs a new ledger or new joists anyway, rebuilding the whole deck often costs only a little more. You get new footings and a properly flashed ledger, and the whole deck is built at one time to one standard. If you are curious how prices move across town, we broke down deck costs by Naperville zip code.
A ten minute check you can do before you call anyone
You need a tape measure, a screwdriver, a flashlight, and your plat of survey.
- Lift one deck board near the middle of the deck and measure from the left edge of one joist to the left edge of the next. Sixteen inches is good news. Twenty four means the old frame needs reframing before it can take composite.
- From underneath, look at the top of the ledger where it meets the house. You want to see metal or membrane flashing lapped over it. If the siding runs straight down behind the ledger, or you see nail heads where there should be bolts, assume the ledger needs work.
- Push the screwdriver into the ledger and into a few joist ends near the house. Firm wood is fine. If the screwdriver sinks in, the extension question is settled, because the old deck needs a rebuild.
- Lay a long level or a straight board across the deck toward the side you want to extend. A visible dip means the old frame has settled and the seam will need attention.
- Look at the bottom of each post. A gap between the post and its footing, or a post that leans, means a footing has moved.
- Measure on your plat of survey from the rear lot line to where the extension would end, and compare it with the setback rules above.
If the spacing is 16 inches, the ledger is flashed and bolted, the wood is firm, and the posts are straight, a tie-in is realistic. Wide spacing on its own just adds reframing to the job. Soft wood or an unflashed ledger usually points to a rebuild, and a footing that has moved needs a closer look before anyone builds onto it.
Questions we get about deck extensions
Do I need a permit to extend my deck in Naperville?
Yes. The city requires a permit for any elevated deck and for replacing structural parts of an existing one, and an extension usually involves both. If you are not sure whether your project counts, the City of Naperville Building Permits team at (630) 420-6100 can tell you.
Can I use composite on the new section and keep my wood boards?
You can, but the two will never look like one deck. If you decide later to resurface the old section in composite, its frame will have to meet composite joist spacing at that point, so it is usually cheaper to plan both at once.
Can you add a lower level instead of making the deck bigger?
Yes, and it is often the cleanest way to extend. A step down to a new level on its own frame and footings does not lean on the old structure, and the step hides small differences in height between the two sections. Each level still needs footings at frost depth.
How long does a deck extension take?
Permit review is usually the longest part, at two to four weeks. Build time depends on the size of the extension and how much of the old frame needs work, and we give you a schedule with the quote.
Will my HOA need to approve a deck extension?
If your subdivision has an architectural review board, almost certainly, because the footprint and the look of the deck are changing. Several Naperville associations want their approval letter in hand before the city will issue the permit.
If you want us to look at your deck
We will come out, lift a board, check the ledger and the joists, measure the spacing, and tell you whether your deck can take a tie-in, needs a separate section, or should be rebuilt. The visit is free and there is no pressure to book anything.
Wolf Spirit Deck
2020 Calamos Ct, Suite 200, Naperville, IL 60563
(312) 765-3998
Illinois Contractor License #TGC119852
Serving 60540, 60563, 60564, and 60565, plus Aurora, Lisle, Plainfield, Wheaton, and the western suburbs.
Request a free on site quote, or read more about how we build decks for Naperville homeowners. If the old frame is past saving, our steel deck framing page covers when steel is worth the extra cost.
About the author: Radu Oprea is the owner of Wolf Spirit Deck, a licensed, bonded, and insured deck building company based in Naperville, IL (Illinois Contractor License #TGC119852). His crews have built and repaired composite decks across Naperville and the western suburbs since 2018. You can verify the license through the Illinois Department of Financial and Professional Regulation, and we recommend doing that with any contractor you hire.